User's Manual

MG500-EU-EN v1.0 7/13
12
TransformerTesting
Transformer tests are performed with the transformer completely disconnected from the line
andtheload.Notethatthecasegroundshouldnotberemoved.
Thefive tests listed belowwill completely test a singlephase transformer. Notethat at least 1
minuteshouldbeallowedbetweeneachtest.
1. High
voltagewindingtolowvoltage
windingandground
2. Lowvoltagewindingtohighvoltage
windingandground
3. Highvoltagewindingtolowvoltage
winding(picturedatright)
4. Highvoltagewindingtoground
5. Lowvoltagewindingtoground
NotesonMeasuringtheResistanceofaContactororCircuitbreaker
AContactororCircuitbreakermustprovidealowresistancepathtoelectricitywhenclosedbut
shouldprovideahighresistancewhenopen.Astheyage,theircharacteristicsmaydeteriorate
becauseofheavyuse,operationinadirtyenvironment,orotherfactors.
UnusualInsulationResistanceMeasurementApplications
o Specialpaintorvarnishmaybeusedasaninsulatorontransformersandotherelectrical
applications
o Insulatingblankets,suitsandglovescanalsobetested
Connect the
GREEN lead here
Connect the
RED lead here