User manual
Operation
AdjustingtheCuttingHeight
Thecuttingheightofthemowerdeckisadjusted
from1to5inches(2.5cmto12.7cm)in1/4inch
(6.4mm)increments.
1.Stopthemachineandmovethemotioncontrol
leverstotheneutralposition.
2.DisengagethePTO.
3.Raiseandlockthedecktothe5inch(12.7cm)
transportposition.
Thedeckisraisedbypullingthedecklifthandle
rearwardandtotherighttoplaceitintothe
transportlockposition.
Figure14
1.Transportlockposition
3.Frontreference/speed
controlbar
2.RHMotioncontrollever
4.Decklifthandle
Note:Whenchangingthecuttingheight
positions,alwayscometoacompletestop
anddisengagethePTO.
4.Inserttheheightadjustmentpinintothehole
correspondingtothedesiredcuttingheight.
Seethedecalonthesideofthedeckliftplatefor
cutheights(referenceFigure15).
5.Pullthedecklifthandlerearwardandtotheleft
andslowlyallowthedecktolowertothecutting
height.
Figure15
1.Heightadjustmentpin
3.Decklifthandle
2.Heightofcutholes
Transporting
TransportingaUnit
Useaheavy-dutytrailerortrucktotransportthe
machine.Lockbrakeandblockwheels.Securely
fastenthemachinetothetrailerortruckwithstraps,
chains,cable,orropes.Besurethatthetrailerortruck
hasallnecessarylightingandmarkingasrequiredby
law .Secureatrailerwithasafetychain.
CAUTION
Thisunitdoesnothaveproperturn
signals,lights,reectivemarkings,ora
slowmovingvehicleemblem.Drivingona
streetorroadwaywithoutsuchequipment
isdangerousandcanleadtoaccidents
causingpersonalinjury.Drivingonastreet
orroadwaywithoutsuchequipmentmayalso
beaviolationofStatelawsandtheoperator
maybesubjecttotrafcticketsand/ornes.
DoNotdriveaunitonapublicstreetor
roadway.
23










