User guide

TABLE OF CONTENTS
ii
QUICK OPERATION .................................................................................................. Back Cover
HOW TO READ THE AT30 MODEL NUMBER .............................................Inside Front Cover
IMPORTANT SAFETY INSTRUCTIONS ......................................................................................i
1 Receiving and Installing the AT30 Battery Charger
1.1 Storing the AT30 ....................................................................................................2
1.2 Reporting shipping damage ...................................................................................2
1.3 Unpacking and inspecting the AT30 ......................................................................2
Inspection checklist ................................................................................................2
1.4 Moving the AT30 ....................................................................................................3
Enclosure type and weight table ............................................................................3
1.5 Mounting the AT30.................................................................................................4
1.5.1 Floor-Mounting the AT30 (standard)................................................................4
1.5.2 Wall-Mounting the AT30 (optional) ..................................................................6
1.5.3 Rack-Mounting the AT30 (optional).................................................................8
1.6 Changing the transformer taps.............................................................................10
1.7 Making the ac input connections..........................................................................12
1.8 Making the dc output connections........................................................................14
1.9 Wiring the AT30 for remote sensing.....................................................................16
1.10 Wiring to the remote alarm contacts ....................................................................18
Auxiliary Relay Board (optional)...........................................................................19
1.11 Installing the temperature compensation probe (optional)...................................20
Using temperature compensation ........................................................................22
1.12 Installing the AT30 for remote communications (optional)...................................23
1.13 Installing the AT30 for forced load sharing (optional) ..........................................23
2 Operating the AT30 Battery Charger
2.1 Starting the AT30
2.1.1 Understanding the start-up sequence............................................................24
2.1.2 Checking the installation................................................................................24
2.1.3 Starting the AT30...........................................................................................24
Using the digital meter ...................................................................................24
Factory settings table.....................................................................................25
2.2 Using the AT30 front panel features
2.2.1 If the meter displays an error message .........................................................26
2.2.2 Selecting the meter mode..............................................................................26
2.2.3 Selecting the Float or Equalize mode............................................................27
2.2.4 Choosing the Equalize method......................................................................27
Manual Timer method....................................................................................27
Manual Equalize method ...............................................................................28
Auto-Equalize Timer method .........................................................................28
2.2.5 Testing the front panel indicators...................................................................29
2.2.6 Testing the Auxiliary Relay Board (optional) .................................................29
2.2.7 Interpreting the alarm indicators ....................................................................29