User Manual
LIST OF ILLUSTRATIONS
Page
3 Fig. 1A-B Typical Systems - Top View
5 Fig. 2 Packed Modules
5 Fig. 3 Unpacking Modules
6 Fig. 4 Handling - Lifting Strap Placement
6 Fig. 6A-B-C Typical Horizontal Stack Arrangements - Front Views
7 Fig. 7 Typical Horizontal Stack Arrangements - Back to Back and End to End
7 Fig. 8 Hardware Installation for 2.67” Wide I-Beam Support
7 Fig. 9 Hardware Installation for 4.5” Wide I-Beam Support
7 Fig. 10 Completed I-Beam Support to Module Installation
8 Fig. 11 Handling Module - Base Support Assembly
8 Fig. 12A Tip-Over Procedure - Shackle-Strap Usage
9 Fig. 12B Tip-Over Procedure
9 Fig. 13 Module with Base Assembly After Tip-Over
9 Fig. 14 Horizontal Stacking - Shackle-Strap Usage
10 Fig. 15 Handling and Stacking Horizontal Modules
10 Fig. 16 Hardware Installation Sequence
10 Fig. 17A Installing Hardware
10 Fig. 17B Completed Horizontal Stack
10 Fig. 18 Positioning Horizontal Base Modlule
11 Fig. 19A Horizontal Stacks - Back to Back Positioning
11 Fig. 19B Completed Horizontal Stacks - Side by Side
11 Fig. 20A-B Tie Plate Assemblies - Horizontal Stacks
13 Fig. 21 Various Inter Stack and Intra Stack Connections - Horizontal Arrangements
14 Fig. 22 Terminal Plate Kit - 6 Cell Modules
15 Fig. 23 Terminal Plate Kit - 3 Cell Modules
16 Fig. 24 Installation Guide for Absolyte GP Transparent Cover
22 Fig. 25 Absolyte Battery Maintenance Report
APPENDICES
24 A Temperature Corrected Float Voltages
25 B Maximum Storage Interval Between Freshening Charges Versus
Average Storage Temperature
26 C Bonding and Grounding of Battery Rack
27 D Absolyte GP Maximum Module Stack Heights