Installation Guide

U channel
Installation
6
13
1
±0.0±0.0
see NOTE
H
U channel
2
3
4
see NOTE
see NOTE
· If a Stud is present behind the wall:
drill a Ø3/16”(4mm) hole up to the stud,
drill an Ø1/8”(3mm) pilot hole into the stud and
use the ST4.0 x 30mm Pan Head Screws (bb)
OR
· If No Stud is present behind the wall:
drill a Ø1/4”(6mm) hole and insert the Wall Anchors (aa)
and use the ST4.0 x 30mm Pan Head Screws (bb).
NOTE
X3
bb
X3
aa
SHOWER DOOR
Hotline : + 1 302 336 8180