Installation Guide
Table Of Contents
8
1-2
1
· If a Stud is present behind the wall:
drill a Ø3/16”(4mm) hole up to the stud,
drill an Ø1/8”(3mm) pilot hole into the stud and
use the ST4.0 x 30mm Pan Head Screws (bb)
OR
· If No Stud is present behind the wall:
drill a Ø1/4”(6mm) hole and insert the Wall Anchors (aa)
and use the ST4.0 x 30mm Pan Head Screws (bb).
NOTE
2
3
see NOTE
see NOTE
Wall Jamb Installation
X3
aa
SHOWER DOOR
Hotline : + 1 302 336 8180
4
X3
bb
silicone the
back of the
Wall Profile