SHOWER DOOR Shower Door Installation Instructions Reversible For a Left or Right Door Please Do Not Return the Product to the Store. Contact us with any questions.
SHOWER DOOR Model Specific Preparation REQUIRED: ±0.0 3/8” (10mm) Out-of-Plumb Adjustment within the Wall Profile; Verify threshold and walls with a level.
SHOWER DOOR PACKAGE CONTENT cc dd D J K L bb C E aa B F A G H M I N PACKAGE CONTENT PART# DESCRIPTION QTY PART# DESCRIPTION QTY A Bottom Gasket 2 H U channel 1 B Door panel-1 1 I Alu.
SHOWER DOOR PACKAGE CONTENT A B C D E F G H I J K L M N x2 x1 x1 x1 x1 x2 x1 x1 x1 x1 x1 x2 x1 x2 HARDWARE CONTENT bb aa Wall anchor Ø6x38mm 7 pcs Screw ST4*30 7 pcs cc ee dd Fitting 7pcs Screw ST4*10 7 pcs Wood 2 pcs Additional spare parts are included. NOTE Inspect all parts for missing prior to installation! Contact us for any part missing.
SHOWER DOOR TOOLS REQUIRED Drill Bits Screw Driver Drill Level Measuring Tape Soft Head Hammer Pencil Knife Sealant MASONRY DRILL BIT FOR TILE Ø6mm Safety Glasses Glove Carpenter's Squarer Masking or painter's tape 3.2/6mm dia.
SHOWER DOOR SAFETY INFORMATION CAUTION Please carefully read the following important safety information before handling or installing this shower. There is a risk of serious injury while handling this product. To minimize these risks, please note: • Always wear safety glasses and gloves while handling. • Always follow the installation instructions. • Inspect glass for damage before installation.
SHOWER DOOR Model Dimensions configuration dimensions: B Model width C Installation width D (Opening) 30" 30" ~31 3/8" 22 17/32" 32" 32" ~33 3/8" 24 17/32" 34" 34" ~35 3/8" 26 17/32" 36" 36" ~37 3/8" 28 17/32" 72" A A Product Height C adjustment 38" max adjustment 1" max B adjustment 38" max adjustment 1" max shower head ° 90 90 ° shower head B B D Left pivot D NOTE Right pivot This model is reversible for right or left-hand door installation.
SHOWER DOOR 1-1 Wall Jamb Installation Confirm the Wall jamb is plumb NOTE with a level before marking the location of the holes for drilling. 1 C X1 Wall Jamb ±0.0 2 m 0m /3 5 [2 ] " 2 2 NOTE Center the Wall jamb (C) on the Threshold.
SHOWER DOOR 1-2 Wall Jamb Installation 1 see NOTE 2 see NOTE aa X3 3 silicone the back of the Wall Profile 4 · NOTE bb X3 If a Stud is present behind the wall: drill a Ø3/16”(4mm) hole up to the stud, drill an Ø1/8”(3mm) pilot hole into the stud and use the ST4.0 x 30mm Pan Head Screws (bb) OR · If No Stud is present behind the wall: drill a Ø1/4”(6mm) hole and insert the Wall Anchors (aa) and use the ST4.0 x 30mm Pan Head Screws (bb).
SHOWER DOOR 2 Door panel Installation The Door panel Profiles can be adjusted up to 3/8” within the Wall Jamb for overall width or to correct NOTE B aX1 dju 1 for out-of-plumb conditions within the model size. Screw them together after making final adjustments. stm en t 83 "M UP AX See label. Pls follow the arrows to install the glass panel! B Return panel can be rotated 180 degrees 2 B Place wood shim(ee) onto the threshold to provide proper spacing beneath the door glass.
SHOWER DOOR 3.1 Glass-to-Glass Hinge Assembly Installation 1 2 outside 3 B Double sides of hinge part install to the B door panel-1. K X2 NOTE outside Ensure the orientation of both Hinge Assemblies are the same. Make sure the Hinge Assemblies (B) are square and flatly installed on the glass To prevent glass-to-metal contact, confirm the gaskets are present between the Hinge Assemblies and the Door Glass.
SHOWER DOOR 3.2 Glass-to-Glass Hinge Assembly Installation Inside View K X2 B L L ee Wood Place wood shim(ee) onto the threshold to provide proper spacing beneath the door glass. NOTE NOTE Make any final adjustments to the door so that it is level and plumb in the opening. outside Ensure the orientation of both Hinge Assemblies are the same.
SHOWER DOOR 4 Magnetic strip Install to door panel-2 1 F X1 L Magnetic Seal Aluminum channel 2 G H U channel 1" max wall adjustment 3 G X1 H X1 Keep flush 1、Magnetic strip Install to door panel-2. NOTE 2、Put F,G,H together before fasten the glass door,make all these parts keep flush.
SHOWER DOOR 5 Fasten the door panel After final adjustments, drill Ø1/8” holes in the Wall Jamp (C). Drill only through the first layer of the Door panel Profile and NOTE install the ST4.0x10mm Pan Head Screws (dd) using the Decorative Covers and Washers (cc) Adjustment 38" max Inside View Adjustment 1" max 1 Drill Bit Φ=1/8" Keep flush 2 cc X3 dd X3 3 Inside View Include the washers when ST4X10mm Pan Head Screw installing the ST4.0×10mm NOTE Pan Head Screws (dd) and Decorative Caps (cc) .
SHOWER DOOR 6 Determine the G & H position L G H Pencil Put F,G,H together, keep flush, mark the position on the wall. NOTE Center the Magnetic Seal Aluminum channel(G) and U channel (H) on the Threshold.
SHOWER DOOR 7 U channel Installation 1 see NOTE H U channel ±0.0 2 see NOTE 3 see NOTE aa X3 4 · NOTE If a Stud is present behind the wall: drill a Ø3/16”(4mm) hole up to the stud, drill an Ø1/8”(3mm) pilot hole into the stud and use the ST4.0 x 30mm Pan Head Screws (bb) OR · If No Stud is present behind the wall: drill a Ø1/4”(6mm) hole and insert the Wall Anchors (aa) and use the ST4.0 x 30mm Pan Head Screws (bb).
SHOWER DOOR 8 Magnetic Seal Wall Jamb Installation Inside View Inside View 1 Inside View 2 Drill Bit Φ=1/8" G X1 1"wall adjustment Inside View Drill Bit Φ=1/8" Inside View cc X3 3 4 dd X3 L L Include the washers when ST4X10mm Pan Head Screw Make sure the magnetic seals close properly!! installing the ST4.0×10mm NOTE Pan Head Screws (dd) and Decorative Caps (cc) .
SHOWER DOOR 9 handle Installation B E X1 NOTE Remove the wood shims(ee) and open the door.
SHOWER DOOR 10 Top Cover Cap & Vertical Gasket Installation 1 D X1 2 inside J X1 Attach the Vertical Gasket (J)to the inside edge of NOTE the Door Glass that is on the same side as the shower head so that the flexible fin is pointing away from the water source.
SHOWER DOOR 11 1 NOTE Bottom Gasket Installation Measuer "X" and cut the Bottom Gasket same length as "X". X "X1" is from pivot 2 "X2"is from J to F. channel to glass B edge.
SHOWER DOOR 12 Alu.Threshold Installation Left pivot Right pivot 1 2 X M1 M2 N1 "X" M to N width. N2 I X1 3 4 X+ (1 9 /16 inc h) 5 6 I M1 N1 1. Threshold Cap(M&N) are divided into left and right two types, Select according to the installation method Threshold Cap(M&N) as Fig 1; 2. Measure "X" and cut the Alu. Threshold(I) same length as "(X+1 9/16inch)" as Fig.2 ; Fig.3 and Fig.4; 3. Apply silicone into the groove along the entire length of the Alu. Threshold(I) as Fig 5; 4.
SHOWER DOOR 13 NOTE NOTE SEALING The surfaces need to be clean and free of debris before applying silicone. Ensure that the Shower door closes tightly and opens smoothly. Apply a good quality silicone sealant along the wall Jamb(C)&(H)and Water seal (I) . Allow 24 hours for the silicone to cure before using the shower. 24 hour ! Apply Silicone Sealant,(not supplied).
SHOWER DOOR This troubleshooting guide is for general aid only. For service and installation issues or concerns, please contact us by + 1 302 336 8180. Troubleshooting Problem/Symptom Suggested Solution Page(s) *Check all shipping/packaging material for missing Missing parts parts/components. 2.3 *If not found, please contact us by hotline + 1 302 336 8180 to order factory part replacement. *Check the magentic seal (F)and pvc seal (J) for proper trimming and installation.