User's Manual

Table Of Contents
Exalt Installation and Management Guide
EX-i Series GigE (FDD) Digital Microwave Radios
202675-008 9
2016-06-01
radio link endpoints are distant from one another. A back-to-back bench test and pre-configuration will
provide confidence that the radio link is operational and properly configured prior to installation, so
that if troubleshooting is necessary, the radio hardware and configuration settings are eliminated from
the troubleshooting process. Verify the following in the back-to-back testing:
Confirm that the radio system is generally operational
Radios power-up with planned power and wiring solutions
RF link connects in both directions
Traffic passes across the link
Configure connected equipment and cabling
Test Ethernet (CAT5) cabling, and/or TDM cabling, any auxiliary connector cabling and
configure all interfaces
Configure IP settings for configuration and management
Configure passwords and security modes
Become familiar with the configuration and management interfaces through the Exalt GUI
interface
Configure radio parameters, including installing any optional software license keys and
configuring features controlled by license keys
Set transmitter output power to engineered or allowed level (see
RF Output Power Setting)
Set operating center frequency
Set occupied channel bandwidth and Mode (modulation) setting
Make detailed radio performance measurements
Measure transmitter output power
Measure receiver threshold performance
Confirm unfaded error-free performance
Some of these tasks may not be possible or practical within a bench test environment due to the nature
of the remote connectivity of peripheral equipment. However, it is good practice to perform as much as
possible in this environment to minimize field/installation time and troubleshooting efforts.
Detailed performance measurements are usually not required for pre-installation, but can be easily
performed at this stage and may be helpful for later troubleshooting efforts or for internal records.
During troubleshooting, there may often be a point at which a back-to-back bench test should be
performed to verify many or all of the above items, and in the case of a suspected faulty device, to help
confirm the fault and determine which end of the system is at fault and in need of repair or
replacement.
RF Output Power Setting
The maximum RF output power is bounded by one of the following criteria:
Maximum RF output power setting capability of the radio device
Note: See Back-to-back Bench Testing for detailed instructions.