Installation Guide
Note: Before assembling the foundation insert 3
M6x15 Bolts as shown for the sliding door
guide.
See page S1.
Note: When assembling the foundation in this step
only tighten the nuts hand tight. The corners may
need to be slightly loose to attach the corner uprights
Suggestion: If the unit is to be installed
on a concrete foundation you will need
to cut PRO210 flush with the bottom of
PRO6120.
You can lay the cut off PRO210 peices
on their side and use them to secure the
PRO6120 to the concrete foundation.










