Installation Guide
PRODUCT INFORMATION 
Dear customer 
Thank you for buying a high-quality aluminium greenhouse. 
REMARKS 
In all  drawings you  find  the mounting-instructions for all 
basic  standard-models.  However  this  manual  should  be  a 
sufficient  guidance  for  all  special-case  greenhouses.  This 
greenhouse  is designed  for  cultivation  of  plants/flowers. 
Therefore  leakage,  water  drops  and  condensation  inside 
the building are allowed.  The building may only be entered 
by  competent  persons  during  cultivation  or  maintenance. 
Aluminium profiles that  are  not painted may  show black 
stains, these stains are not a production error: they can be 
easily removed with a aluminium cleaner available at every 
good  drugstore.  The rubber  strips have been treated with 
oil/silicone  on  the  interior  to  facilitate  the  assembly.  The 
building should be mounted on a solid concrete foundation 
deep enough to  get a  solid and  frost-free ground.   During 
winter the roof has to be cleared of snow or supported in a 
suitable way. The greenhouse should be built in a location 
protected  from  strong  winds.  Protective  gear  (such  as 
protective gloves) should be used during mounting in order 
to  avoid injuries. One  should  at  all  times pay  attention  to 
the local building regulations. 
ASSEMBLY ORDER 
The  assembly  procedure  is  the  same  for  all  our 
greenhouses. 
- Sorting of the profiles according the model. 
- Mounting of the complete aluminium construction. 
- Leveling of the construction using a waterlevel. 
- Securing the building to the ground 
- Glazing. 
REQUIRED TOOLS 
Socket  wrench  nr.  10  or  spanner  nr.  10,  water-level, 
screwdriver, drilling machine + drill 4.2 mm, scissors (to cut 
the rubber).  
We  reserve  the  right  to  change  the  construction  without 
prior notice! 










