Installation & Assembly

06
C
#C
D
#D
A
#A
B
#B
Top rail / Frame
Step 1
There are total 4 L-shaped frames and 4 straight frames.
Before assembly, put all the frames on the ground. Ensure that the sides of frames with
spring holes face up. The square holes for the net pole are inside of the frames.
There should be total 13 pcs spring hole on the wide side and 17 pcs spring hole on the long
side once the frame is fully assembled.