Installation & Assembly
12
Check each connection and ensure all are properly screwed and locked.●
●
For the last 2 rods, it is better 2-3 people to do it.
Making adjusting of the top sleeves.
The net top sleeve is soft with tension. 2 people pull the top sleeves to the direction of the last
connection points from opposite directions, so that the net top sleeve is fully stretched. At the
same time,the last person holds the last two rods; bend the left-hand rod to left direction and
the right-hand rod to right direction until the rods fit together.
●
1
2
Safety Net
2
PROBLEM
Cannot connect the last 2 steel rods?
1
2