User Manual User guide

Issue 1.16.A
82
19. Backup of EVS
Server Trains to Files
This section covers XML Jobs IDs:
Job #20: Backup Train (IPDirector v5 onwards)
Job #21: Update Backup Train Job (IPDirector v5 onwards)
19.1 WORKFLOW
The following schema shows how the backup of trains is performed with the
Gigabit connection and XTAccess: