User's Manual User Manual

IP Director Version 4.3 – User Manual – Part 1: Introduction
EVS Broadcast Equipment
Issue 4.3.C
process status: “in progress” or “finished”
user who performed the copy/move.
ACKNOWLEDGE BUTTON
When the users have read a message, they can acknowledge it
by clicking the ACK button. The Acknowledge button changes the
background of the selected message to grey. This helps the user
distinguish the messages that have been dealt with from the
ones that have not.
2.6.6 PROCESS STATUS ICONS
The background colour of the Status icons provides information
on the status of the processes that run in the background:
When the background colour is green, the process is running
or the connection is established.
When the background colour is yellow, the process is not
running or the connection is not established.
For more information on these processes, refer to the Technical
Reference manual.
Icon Description
IPDP Status icon for the IP Director Routing process
DB Status icon for the database connection
SDB Status icon for the SynchroDB process
IPSH Status icon for the IP Scheduler process
VTR Status icon for the VTR Engine process
XT Status icon for the XT connection
33