Instruction manual
11
www.evolutionbuild.com
6. Install the new 210 mm (8-1/4”) blade. Make sure the
rotation arrow on the blade matches the clockwise rotation
arrow on the upper guard. The blade teeth should always
point downward at the front of the saw.
7. Install the blade washer and arbor screw.
8. Lock the arbor and use the allen key to secure the blade.
9. Tighten the arbor screw using moderate force, but do not
overtighten.
10. Replace the guard operating arm using the stored screw.
(Fig. 1)
11. Ensure that the allen key is removed and the arbor lock
has released before operating the machine
WARNING: Ensure the blade guard is fully functional before
using the machine.
Note: Spacers and spindle rings should not be used with this
machine and/or blade.
3. Debris collection bag
The Debris Collection Bag should be attached at the debris
extraction port.
1. Slide the frame of the collection bag on to the outlet of the
extraction port, ensuring that it is firmly connected.
2. To release the bag, slide the frame in the opposite direction.
Note: To ensure optimal dust collection, empty the dust bag
when it becomes approximately 2/3 full.
WARNING: Before cutting metal materials, the collection
bag should be removed and replaced with a blanking plug.
Reinstate the dust bag when cutting wood.
OPERATING INSTRUCTIONS
Disconnect the Mitre Saw and inspect your Saw before
each use.
Note: It is important that the operator is adequately trained
in the use, adjustment and operation of the machine and has
read this instruction and safety manual before commencing
operations.
WARNING: To reduce the risk of injury, always unplug the
saw before changing or adjusting any of the machines parts.
Compare the direction of rotation arrow on the guard to
direction arrow on the blade. The blade teeth should always
point downward at the front of the saw. Check the tightness
of the arbor screw.
Fig 3
Fig 4
OPERATION
GB










