Instructions / Assembly

INSTALLATION INSTRUCTIONS
Affinity 30G
Evo, Inc., 20560 SW 115th Ave., Tualatin, OR 97062 USA
Phone 503.626.1802 | Fax 503.213.5869 | www.evoamerica.com | support@evoamerica.com
11
27
19
32
"
701.04mm
27
3
4
"
704.85mm
1
15
32
"
37.16mm
R18
1
8
"
460.38mm
13
1
8
"
333.38mm
26
23
32
"
678.51mm
13
13
16
"
350.52mm
STEP 2: Mark the nished position of the Evo Af nity 30G drip pan on the countertop using
the dimensions shown. The circular dimension of 36.25” is the diameter of the drip pan to the
outside material thickness (e.g. to the inside of the rolled bead edge). The drip pan cutout
must be made precisely to these dimensions (or at a maximum +1/16”) so that the half-rolled
top bead on the drip pan edge overhangs the cutout dimension by .25”. (See following page
for more details).
OPENING IN COUNTERTOP FRONT
Countertop
overhang to
cabinet front
TOP VIEW
COUNTERTOP INSTALLATION (1 of 4)
NOTE:
If the dimensions for the
countertop overhang and
countertop depth cutout
are not followed, there will
be a con ict with the door
swing which allows access
to the waste containers.