Installation Sheet

INSTALLATION INSTRUCTIONS
Affinity 30G
Evo, Inc., 20560 SW 115th Ave., Tualatin, OR 97062 USA
Phone 503.626.1802 | Fax 503.213.5869 | www.evoamerica.com | support@evoamerica.com
7
INSTALLATION AND USE CHECKLIST
UNPACK COOKTOP COMPONENTS 8
Follow unpacking instructions carefully
CLEARANCE TO COMBUSTIBLES DIMENSIONS 9
PREPARE COUNTERTOP FOR INSTALLATION 10-13
INSERT CHASSIS IN COUNTER TOP 14
INSTALL DRIP PAN AND DRIP PAN GASKET 15-16
ASSEMBLING COOK SURFACE RETAINING FASTENERS 17
INSTALL COOK SURFACE AND TIGHTEN FASTENERS 18-20
CONNECT GAS & CHECK FOR LEAKS 21-25
CHECK LIST FOR INSTALLATION PROCEDURES 26
TEMPERATURE CONTROL AND LIGHTING INSTRUCITONS 27-28
RECOGNIZING ABNORMAL GAS OPERATION 29
REPLACING ELECTRONIC IGNITOR BATTERY 30
MAINTAINING SPILLOVER TRAYS 31
AFFINITY 30G DIMENSIONS 32
COOKING SURFACE MAINTENENCE 33
PAGE