Installation Sheet

INSTALLATION INSTRUCTIONS
Affinity 30G
Evo, Inc., 20560 SW 115th Ave., Tualatin, OR 97062 USA
Phone 503.626.1802 | Fax 503.213.5869 | www.evoamerica.com | support@evoamerica.com
13
1
9
16
"
40mm
1
3
16
"
30mm
27
3
4
"
704.85mm
7.65in
194.36mm
Shelving or
drawers can
be installed
under Afnity
30G if
desired.
FRONT VIEW
STEP 3: Construct a bay for the Evo unit with your chosen cabinet system. Position and
fasten the supplied mounting brackets 7.65” below the nished counter top surface.
Metal right angle mounting brackets supplied with unit are
each 1/16” thick. Mount angle brackets as shown. Unit slides
into framework and rests on top side of brackets. Brackets
are slotted for fasteners at each four corners.
Cabinet
Framework
Example: Tiled counter top with substrate.
Finished counter top thickness should be
3 cm (1-1/5”).
COUNTER TOP INSTALLATION (4 of 4)