installation and_manual
INSTALLATION INSTRUCTIONS
A f f i n i t y   3 0 G
Evo, Inc., 20560 SW 115th Ave., Tualatin, OR 97062 USA
Phone 503.626.1802 | Fax 503.213.5869 | www.evoamerica.com | support@evoamerica.com
28
CHECK INSTALLATION
DRIP PAN PROPERLY INSTALLED        16
  Ensure that the drip pan half-rolled top bead overhangs
  the cutout dimension by .25” and the black o-ring
  is creating a seal against the counter top.
DRIP PAN GASKET SECURED          17
  Black drip pan gasket should fi t properly and create a 
  seal where the drip pan meets the chassis skirt.
COOK SURFACE INSTALLED PROPERLY      18-21
  Cook surface support rails should be sitting on 
  chassis top with rear bullet secure in rear slot and 
  two front fasteners tightened so cook surface does 
  not move.
GAS CONNECTION HOOKED UP PROPERLY    22-27
  Check for gas leaks.
  Check for proper operation. 
PAGE
Check to ensure the following items are complete:










