installation and_manual
INSTALLATION INSTRUCTIONS
A f f i n i t y   3 0 G
Evo, Inc., 20560 SW 115th Ave., Tualatin, OR 97062 USA
Phone 503.626.1802 | Fax 503.213.5869 | www.evoamerica.com | support@evoamerica.com
14
Shelving or 
drawers can 
be installed 
under Affi  nity 
30G if 
desired.
FRONT VIEW
STEP 3: Construct a bay for the Evo unit with your chosen cabinet system. Position and 
fasten the supplied mounting brackets 7.65” below the fi nished counter top surface. 
Metal right angle mounting brackets supplied with unit are 
each 1/16” thick. Mount angle brackets as shown. Unit slides 
into framework and rests on top side of brackets. Brackets 
are slotted for fasteners at each four corners.
Cabinet 
Framework
Example: Tiled counter top with substrate. 
Finished counter top thickness should be 
3 cm (1-1/5”).
COUNTER TOP INSTALLATION (4 of 4)










