User's Manual

LPR (LOW PRESSURE REGULATOR)
ADJUSTMENTS + MAINTENANCE
CHANGING THE SEAL RETAINER
1 Screw out LPR cap in front of the marker using a 1/4” Allen wrench.
2 Screw out LPR seal assembly (brass) using a 3/16” Allen wrench.
3 Screw in new LPR seal assembly.
4 Screw LPR cap in place securely.
If the user needs to replace the whole LPR assembly, follow these instructions
(refer to figure 2):
1 Remove the air supply and relieve all gas pressure from the EVIL
®
MINION
.
2 Take the Hyper2
Regulator off the marker. (See page 12)
3 Screw out LPR set screw using a 5/64” Allen wrench.
4 Screw out LPR cap using a 1/4” Allen wrench.
5 Pull out the LPR by screwing a rod with a 10/32” thread into the seal retainer
(brass piece) inside the LPR and pulling it out.
6 Put everything back in reverse order. Be sure to grease the #012 O-rings, so as to
prevent cutting them upon installation.
NOTE: Use of the included EVIL
®
PUS
®
or Slick Lube lubricant is highly recommended.
7 Tighten LPR cap securely.
The LPR pressure can be set quite accurately even without an LPR test tool.
Screwing the adjustment screw (seal retainer) all the way in will set the LPR pressure to
approximately 25 psi. Now turning out the adjusting screw 180 degrees will increase the
pressure by approximately 5 psi.
FOR EXAMPLE: Turning the screw 5 complete turns out will set the pressure to approximately
75 psi. Use a 3/16” Allen wrench to make all adjustments to the LPR.
Turning the adjustment screw clockwise, or in, will lower the LPR’s output pressure.
Turning the adjustment screw counterclockwise, or out, will raise the LPR’s output pressure.
WHEN SERVICING YOUR MARKER:
Always remove the air supply and relieve all gas pressure
in the EVIL
®
MINION
before disassembly.
Make sure your hopper is removed from the
EVIL
®
MINION
.
Make sure there are no paintballs in the breech of the
EVIL
®
MINION
.
It is not recommended for the user to remove the LPR
from the body and disassemble it.
WARNING
11
www.evil-paintball.com
Figure 2