Model: EM-TSP2B BB-1000 Instructions B A M4x12mm 4x E M6.3x63mm 4x www.everik.com M4x30mm 4x F 8mm D C M6x12mm G 2x 4x M6x30mm 4x H 10mm 4x TSP2B.BB1000.ME.102011.
•Phillips screwdriver Tools Required •1/8" drill (3/8" for concrete) • Phillips screwdriver •Stud finder • 1/8" drill (3/8" for concrete) •Power drill • Stud finder • Power drill •Phillips screwdriver A, B, C, D G •1/8" drill (3/8" for concrete) •Stud finder Step 1: Mount wall bracket (Figure 1) •Power drill Wood stud installation • erify stud position • Verify stud position •Centre wall bracket over wood stud • Centre wall bracket over hole wood stud and mark and mark screw locations screw hole•Pre-dril
Modèle: EM-TSP2B BB-1000 Instructions INSTRUCTIONS D’ASSEMBLAGE VEUILLEZ LIRE ATTENTIVEMENT CES INSTRUCTIONS ET LES CONSERVER POUR TOUTE RÉFÉRENCE ULTÉRIURE! SI VOUS NE COMPRENEZ PAS LES INSTRUCTIONS, OU SI VOUS ÊTES INCERTAIN(E) DE POUVOIR LES SUIVRE DE FAÇON SÉCURITAIRE, COMMUNIQUEZ AVEC UN ENTREPRENEUR-CHARPENTIER QUALIFIÉ. LA GARANTIE NE SERA HONORÉE QUE SI LE PRODUIT EST ACCOMPAGNÉ DE LA FACTURE ORIGINALE, ET SEULEMENT SI LES INSTRUCTIONS ONT ÉTÉ SUIVIES À LALETTRE.
•Phillips screwdriver Outils requis drill (3/8" for concrete) • Tournevis•1/8" Phillips •Stud finder • Mèche de perceuse de 1/8 po (3/8 po pour le ci•Power drill ment) screwdriver • Chercheur •Phillips de montant •1/8" drill (3/8" for concrete) • Perceuse électrique •Stud finder •Power drill Étape 1 : Installer le position support mural (schéma 1) • erify stud •Centre wall bracket over wood stud Installationand dans unscrew montant en bois mark hole locations • Vérifiez la•Pre-drill positionholes du montan