Instructions / Assembly

1-800-476-7366
|
INFO@EVERLASTCLIMBING.COM
|
WWW.EVERLASTCLIMBING.COM
© 2014 EVERLAST CLIMBING, A PLAYCORE COMPANY
HOME CLIMBING WALL INSTALLATION INSTRUCTIONS
5
A-2. MULTI PANEL SUB WALL PREPARATION
5. Using your stud finder, find and mark (12)
horizontal feet of studs. With the studs being
16’’ on center you should have marked (10)
studs with a total distance of 12 feet between
the first and last. (Shown for building a 12’
wall. Adjust accordingly for your desired wall
size) SEE FIGURE 10b.
NOTE: Drywall made invisible for clarity in
diagram.
A-1. SINGLE PANEL SUB WALL PREPARATION
5. Using your stud finder, find and mark (4)
horizontal feet of studs. With the studs being 16’’
on center you should have marked (4) studs with
a total distance of 4 feet between the first and
last. (Shown for building a 4’ wall. See A-2 Sub
Wall Preparation for longer configurations)
SEE FIGURE 10a.
NOTE: Drywall made invisible for clarity in
diagram.
STUD FINDER
7
12'
SUB-WALL PREPARATION FIGURE 10-bSUB-WALL PREPARATION FIGURE 10a
4'
A-1 A-2