Installation Guide

2 PK Side Platform
Installation Guide
Before installation the side platform, please be sure
that two top short boards haven’t been installed, or
have been taken off.
1
2a
3.
Turn on the nylon lock
nut by hand.
6. Put the shelf board on top of the 2 brackets, and
drive wood screws into the board through the holes
on brackets from the bottom.
4. Install another bolt
and nut.
7. Install side board and
cover corner posts with
end caps.
3 4
3a 3b
5. Tighten the fasteners.
Use a 5mm hex wrench
to hold the bolt and a
13mm wrench to tighten
the nylon lock nut.
Model#: SP2K2
SP15K2
Questions or Comments?
Email us at service@everbloom-garden.com
Welcome to our website: www.everbloom-garden.com
Distributed by:
Dynaforge Trading LLC St. Paul, MN55101
Email: sales@everbloom-garden.com
1. Align the bracket to
inner corner post. If you
want the side platform
a little bit higher than
side board, choose the
first and the second
holes of corner post to
install the bracket. If
you want the platform
lower than side board,
choose the second
and the third holes.
2.
Insert bolt from inside of corner post to shelf bracket.
2b
5a 5b
6a
6c
6b
2019.05
8. Install another side
platform follow the steps
above.
Suggested tools
1. 5mm T-handle hex wrench
2. 13mm ratchet wrench
3. hand drill

Summary of content (1 pages)