Use and Care Manual

11 WWW.HOMEDEPOT.COM
Please contact 1-844-241-5521 for further assistance.
Deep Well Installation
MATERIALS REQUIRED (NOT INCLUDED)
One can PVC cement & primer (read instructions carefully) One well seal with vent plug
One can thread compound (read instructions carefully) Foot valve
Thread tape Priming tee and plug
Rigid pipe Relief valve
Check valve Adaptor
Flexible plastic pipe/clamps Tank
Elbow Tank tee
Nipple
WARNING: All joints and connections must be AIRTIGHT. A single leak will prevent the proper operation of the pump. Wrap thread tape
clockwise on all threaded connections. For all non-threaded connections, you must use PVC purple primer and PVC cement to ensure airtight
seals. Measure all pipe lengths before attaching.
NOTE: The ejector kit from the factory is for shallow well application. For deep well installation, the venturi tube (B) (J32P-18/#11) and
nozzle (C) (#02) have to be installed.
REPLACING AN EXISTING PUMP
WARNING: Risk of electric shock. Can shock, burn or kill. Disconnect power to pump before working on pump or motor.
1. Drain and remove the old pump and the ejector in the well. Check pipe for scale, lime, rust, etc., and replace it if necessary.
NOTE: Your old ejector (in the well) can’t be properly matched to your new pump. You must use the included ejector to your new pump.
2. Refer the following instruction to finish the new pump installation.
NEW DEEP WELL INSTALLATION (4” OR LARGER WELL)
1
Removing the pre-assembled
nozzle and venturi
Removing the pre-assembled ejector first then removing the pre-
assembled nozzle and venturi.
SKU 1001 480 251, Turn the venturi tube (#13) counter
clockwise.
Remove the venturi tube (#13) and nozzle (#04) with an O-ring
from the ejector.
SKU 1001 480 255, Turn the venturi tube (#14) counter
clockwise.
Remove the venturi tube (#14) and nozzle (#04) with an O-ring
from the ejector.