Instructions / Assembly
Table Of Contents
  9 HOMEDEPOT.COM
    Please contact 1-877-527-0313 for further assistance.
Installation - Joist-out
1 
Preparing the shutter opening
 □ Find a spot in the center of the hallway, drill a hole and 
feed a wire through to mark it. 
 □ Mark space around the wire equal to the area of the rough 
shutter opening in the table on page 5 in the joist-out 
option. 
 □ Remove all insulation above the installation site. 
 □ Drill two 1/4-in. holes (from attic oor through the ceiling) 
at the two corners that are aligned with one of the ceiling 
joists. 
 □ On the ceiling side, draw a straight line between the two 
drilled holes. Use this line as a guide to mark the other 
three sides of the shutter opening, using rough opening 
dimensions in the table on page 5. 
 □ From the ceiling side, drill two more 1/4-in. holes at the 
remaining corners.
2 
Cutting the shutter opening
 □ Cut through the ceiling along the lines using a circular saw. 
Measure the depth of the drywall and adjust the saw so 
you only cut the drywall and avoid the joists. 
 □ Carefully remove the drywall from the opening. 
3 
Cutting the ceiling joist 
 □ Stabilize the joists using 2 X 6 lumber to bridge the joist 
about 6 in. away from either side of the opening.
 □ Attach stabilizers to the joists with #12D nails or 2-1/2-in. 
deck screws. 
 □ Mark two lines on the joists to be cut about 1-1/2 in. away 
from either side of the opening. 
 □ Cut along the lines using a saber saw. Make sure cuts are 
perpendicular and accurate.










