User Manual
9 HOMEDEPOT.COM
Please contact 1-800-305-1726 for further assistance.
Install Shelves
5
□ Make sure your shelves (G) t your closet layout design.
□ Hold the shelf’s (G) front rod, let it t into the bracket’s (H) front notches as
the diagram shows, then push down the shelf’s rear part allowing the
shelf’s rear horizontal rod to lock into the back clip of bracket.
NOTE: The bracket is supposed to be shared by two shelves in system as
shown on the right. Each end of shelf will take up half of bracket.
G
H
2
1
Two shelves
share one
bracket
Installation (continued)
Install Vertical Rail Covers
7
□ Measure open areas of the vertical rail, this includes: bottom of hang track
cover to top of shelves, bottom of shelf brackets to top of shelves, bottom of
brackets to end of vertical rails, etc.
□ Cut the vertical rail cover (E-F) to your desired length with hacksaw.
□ Push and press one end of the vertical rail cover (E-F) to the rail to lock onto
the rail. Press and move the other end to make sure the whole vertical rail
cover is securely in place.
NOTE: For safety, please remember to wear safety gloves, goggles and
strictly follow the instructions of your hacksaw during the cutting.
6
Care and Cleaning
□ To remove dust, stains, and other deposits: Use a soft cloth (or soft brush) with a diluted solution mix of warm water and a mild
detergent (such as liquid dishwashing detergent). DO NOT use solvents.
□ Make sure you thoroughly rinse the surface(s) with clean fresh water after cleaning to remove all residue.
□ Thoroughly dry the surface(s) before reuse.
EverbiIt closet organizer is powder coated. Clean following these steps:
Install Hang Track Covers
□ Place the hang track cover (D/K) with the direction as shown then push to
snap and lock. Slide from left to right to make sure the whole cover is
secured.
□ Make sure to put longer hang track cover (D) on the longer hang track (C).
A
D/K
C/J
Line up and press
onto rail
Cut to your t
E-F
Measure
and cut
Measure
and cut
Measure
and cut