Troubleshooting guide

Page 6
Figure 5
5 Place the Coal Rake Rod through the hole in the Coal Rake Rod Plate and screw to
the front of unit with the screws that held the Igniter assembly in place.
6 – Screw the Multi-Fuel Pot in place.
7 –
Push the Coal Rake in
before inserting the two #8 x 1¼” Coal Rake Retainer screws.
8 – Close the Ash Pan Door and install the Lower Panel.
Installing the Versa Grate System
Please refer to Figures 1 and 2 on pages 3 and 4. The sequence for installing the Versa
Grate system changes slightly compared to taking the components out. Please follow this
sequence:
1 – Install the Rear Bushing Assembly first.
2 Install the Front Bushing Assembly. It has slots to adjust the Shaker Plate, leave it
loose and adjust it later.
3 Slide the Shaft/Cage Weldment through the Rear Bushing and through the Front
Bushing. Do not slide Rod all the way through.
4 – Slide the Spacer on the end of the Rod and line up the holes and insert the Cotter Pin.
5 – Place the Shaker Plate on the Rod and Spacer.