Installation Manual
2. install wall dock
Installation steps
2.1
Select a solid and at vertical surface for installing the
wall dock.
Ensure that the surface is even and solid enough to
resist a pull force of at least 220 lbs (100 kg).
Determine the ideal mounting height by plugging
the wall dock’s power cord into the power outlet and
making sure that the power cord is straight or has a
gentle curve, but it is never stretched.
Note: In case no ideal mounting height can be
achieved, it might be necessary to reposition the
power outlet.
2.2
Find the drilling template at the bottom of the box’s
sleeve and cut it out.
2.3
Place the drilling template onto the wall and use a
level device (e.g. bubble level) to vertically align the
template. Mark the 4 mounting points on the wall and
remove the template.
2.4
Drill holes with a drill round of 8 mm or 5/16”.
2.5
Mount the wall dock at onto the wall using the
supplied 8x65 mm plugs and 5x70 mm screws.
Fasten the screws with the supplied Torx T25 bit.
Do not overtighten.
15 16
Pre-installation checklist
• The cellular network connectivity on the network of the selected operator at the
location of installation is suitable for a continuous mobile communication.
• The available current capacity on location of installation is known (available amperage).
• The reccommended tools are available on site.
• An electric vehicle or an EVSE tester is available on site for nalising the installation
and performing the commissioning of the charging station.
• The mounting option is selected and the necessary provisions are made.
• The ideal mounting height is determined by plugging the station’s power cord into the
power outlet and making sure that the power cord is straight or has a gentle curve, but
it is never stretched.
• All the units and accessories ordered are delivered, inspected and free of damage.
8mm drill
drilling machine
knife
4x
screw 5x70mm
4x
plug 8x65mm
1x bit T20
1x bit T30
Flat head
screwdriver
Tools you need to install the wall dock
Included
in the box
Not included
in the box
bubble
level
2. install wall dock