User Manual
35
EN
Post-installation form
Fill out a separate post-installation form per site.
Station ID(s):
Serial number(s):
Site name:
Site address:
Installer name:
Installer phone number:
Installer email:
Note: Do not close the cover until the post-installation checklist below is completed.
Power on only the Hub at rst. For Satellites, follow “Assigning the correct connector IDs for
each station/port” (see page 29).
Checklist:
The LED ring is solid green
All the connectors on the controller are securely in place
The voltage at the terminal block has been measured and is above 180V
The number on the charging unit has been called in order to commission the station and
the unit has been successfully commissioned (networked only)
The LED ring turned blue during a charge session
Installer signature:
Print name:
Date:
Once completed, please send a copy of this document to help@evbox.com in order to notify
EVBox of proper installation for the listed charging station(s), and the date of the installation for
warranty verication.










