Owner`s manual

13
SUPPORT EQUIPMENT ASSEMBLY
Position equipment platform next to the swim spa under
the swim jets. Do not remove support equipment from
platform. All necessary o-rings are bundled and shipped
in the accessories bag. Carefully install o-rings into
unions and hand tighten all connections. Ensure that
o-rings are properly seated and do not get pinched while
connecting the unions as this will result in leaks. Union
connections are located on the swim spa control heater
manifold, pipe to pipe connections and all pumps.
AQUATRAINER SUPPORT EQUIPMENT PLATFORM TYPICAL (EUROPEAN VERSION SHOWN)
AQUASPORT SUPPORT EQUIPMENT PLATFORM TYPICAL
(NORTH AMERICAN VERSION SHOWN)
OZONATOR CONNECTION
The clear 9.5 mm (3/8 in) ID ozonator tube is
shipped coiled and attached to the back of the
swim jets. Attach loose end to barb on ozonator,
and ensure that the ozone check valve is oriented
vertically.
Equipment may not be exactly as shown.