User Manual

Euromaid 540mm Upright Cooker INSTALLING YOUR NEW COOKER 29
Installing your new cooker
Kick Panel
Stability
Bolt
Stability
Bolt Bracket
Stability Bolt
Hole in Floor
Installation Sequence
• Determinepositionofcookerandant-tiltoor
bracket.
• Markpositionofholesthatneedtobedrilledinto
oor.
• Drillholeswithcorrecttypedrillsuitableforoor
type.
• Securelyxtheanti-tiltplatetotheoorwith
appropriatefasteners.
• Stabilityboltisttedduringproductiontofrontof
cookerbehindkickpanel.Removedoorfromoven,
unscrewkickpanelfromthetopandremovekick
paneltolocatestabilitybolt.
25mm from side of
bracket on both sides
to cupboards or walls
• Repositionthecookerbackintotheanti-tiltoor
bracketandthenmarkthepositionforholeinoor
tohousethestabilitybolt.
• Pullthecookerbackoutanddrilltheboltlocation
hole.Usea10mmmasonryorwooddrill,
dependingonoortype.Whendrillingintoconcrete
ensureaminimumholedepthof30mm.
• Repositionthecookerbackintotheanti-tiltplate,
aligningthestabilityboltbracketwiththe10mm
drilledhole.Thenremovetapefromstabilitybolt
andslidetheboltthroughthebracketandintothe
hole.
• ConnectElectricitysupply/gassupplybutdonot
turnonuntilinstallationiscompleted.
• Slidethecookerbackintotheanti-tiltplatesothat
rearcoverrestsagainsttherearwall.Thencheck
theheightandlevelofthecooker.
Ifrequired,pullthecookerbackoutandadjustthe
levelingfeetasrequired.