Instructions

00119419.DOC, Version 1.3
15/16
The durability of the installation depends very much on the material used at the installation area (building
material) such as wood, concrete, gas concrete, brick etc. This is why the fixing material must be chosen to
suit the wall material. Always ask a specialist for the correct plug/screw combination indicating the maximum
load and the building material.
Procedure:
Step 1: On the baseplate, there are holes for the installation.
Step 2: Hold the baseplate onto the location where the device is to be installed.
Step 3: Mark the boreholes with a pen or a suitable tool.
Step 4: Drill the holes and fix the screws.
Step 5: Install the device onto the screws.
DANGERTOLIFE!
Beforetakingintooperationforthefirsttime,theinstallationhastobeapprovedbyanexpert!
OPERATION
After you connect the device to the mains, the UV-tube lamp needs 3-4 minutes warm-up time until it
reaches full lighting output.
CLEANING AND MAINTENANCE
Disconnectfrommainsbeforestartingmaintenanceoperation!
DANGERTOLIFE!
We recommend a frequent cleaning of the device. Please use a soft lint-free and moistened cloth. Never use
alcohol or solvents!
There are no serviceable parts inside the device. Maintenance and service operations are only to be carried
out by authorized dealers.
Should you need any spare parts, please use genuine parts.
Should you have further questions, please contact your dealer.