COMMISSIONING & SERVICING INSTRUCTIONS
A competent service engineer OFTEC registered should be appointed on an annual basis.
Isolate Power to the boiler
De-pressurise heating system and check expansion vessel pre-charge is the same as the cold
fill pressure, of the heating system. Expansion vessel pre-charge must not exceed 1.5 bar.
Remove inspection door, burner and baffle assembly
Brush down the inside of the heat exchanger and vacuum out debris
Clean baffle assembly
Pull out inserts from stainless steel heat exchanger and clean before replacing.
Ensure stainless steel heat exchanger is thoroughly cleaned.
Empty and clean condensing trap
Inspect and clean burner assembly, and replace with new nozzle (see burner manual)
Renew any insulation e.g. inspection door or inside base of heat exchanger
Reassemble baffles and replace inspection door.
Replace paper oil filters
Turn electrical supply to the boiler to ON.
Set central heating controls so they are calling for heat.
Set burner pump pressure.
Allow time for the boiler to reach normal operating temperature.
Check the smoke reading.
Measure the Co
2
Measure net flue gas temperature.
Check domestic hot water flow and hot temperature is acceptable to the householder.
PLEASE NOTE: Reducing the air supply into
the burner air inlet shutter, decrease the flue
gas temperature and increases the Co
2
Condensin
g
Trap