Technical data
Issue No.1 Combined Manual 24.10.07
33
COMMISSIONING & SERVICING INSTRUCTIONS
A competent service engineer OFTEC registered should be appointed on an annual basis.
• Isolate Power to the boiler
• De-pressurise heating system and check expansion vessel pre-charge is the same as the cold
fill pressure, of the heating system. Expansion vessel pre-charge must not exceed 1.5 bar.
• Remove inspection door, burner and baffle assembly
• Brush down the inside of the heat exchanger and vacuum out debris
• Clean baffle assembly
• Pull out inserts from stainless steel heat exchanger and clean before replacing.
Ensure stainless steel heat exchanger is thoroughly cleaned.
• Empty and clean condensing trap
• Inspect and clean burner assembly, and replace with new nozzle (see burner manual)
• Renew any insulation e.g. inspection door or inside base of heat exchanger
• Reassemble baffles and replace inspection door.
• Replace paper oil filters
• Turn electrical supply to the boiler to ON.
• Set central heating controls so they are calling for heat.
• Set burner pump pressure.
• Allow time for the boiler to reach normal operating temperature.
• Check the smoke reading.
• Measure the Co
2
• Measure net flue gas temperature.
• Check domestic hot water flow and hot temperature is acceptable to the householder.
PLEASE NOTE: Reducing the air supply into
the burner air inlet shutter, decrease the flue
gas temperature and increases the Co
2
Condensin
g
Trap










