Manual

16 | Turntable Installation Considerations
Power and Signal Lines
CONDUIT
Power and signal line paths should be planned in advance. Conduit should be in
place before pouring concrete or installing the ground plane. Consider the size of
the cable bundle when selecting conduit diameter.
ELECTRICAL CONSIDERATIONS
Electrical connection is subject to local electrical codes, and
should only be performed by a qualified electrician.
A qualified and licensed electrical contractor should install power lines, and the
installation should comply with all applicable regulatory agencies. A dedicated
circuit should be used, with the shortest distance possible between the power
source and the turntable.
For more information on electrical installation, see page 17.
ACCESS
An access area beneath the turntable is advisable for large diameter
installations. A service switch should be installed to deactivate the turntable
during service.
Outdoor Installations
DRAINAGE
A centerline drain of at least 15 cm (6 in) must be installed to provide proper
drainage during rainstorms and other moisture-collecting situations.
COLD CLIMATE CONDITIONING
The oil used in the gear assemblies will congeal at 2°C (28°F). Turntables
operated in these temperatures should include a heat source or dehumidifier, or
both.