Phau Ntawv Qhia

OPERATION CHECKS:
This product is tted with an automatic, self-test
function that will commission and test itself in
accordance with the requirements of the British
Standards. Monthly, semi-annual and annual tests
will be automatically completed as detailed below
with tests including battery charge condition,
functional test and duration test.
Monthly – two minute functional test
Semi-Annual - full three-hour duration test
Annually – full three-hour duration test
When the tting is rst installed, and the battery
is fully charged the automatic test system will
perform the rst monthly 2 minute test, then at 30
day intervals it will perform the same 2 minute test
a further 4 times.
At 6 months the automatic test system will perform
a full check to ensure the battery discharge duration
is greater than 3 hours then will return the tting to
normal operation
The automatic test system will then perform a
further 5 monthly tests at 30 day intervals and
nally a full duration test at 1 year to ensure the
battery discharge duration is greater than 3 hours,
then return the tting to normal operation
The schedule of these tests will be remembered if
no power is supplied to the luminaire
If there is a mains failure during the self-test
operation the unit will go into emergency mode
If there is a mains failure in 24 hours before a test
is due to be conducted, the test will automatically
be postponed until sucient time is allowed to
recharge the battery.
TESTING
This product is designed to conduct self-testing in
accordance with BS EN 62034, the results of monthly
and annual tests should be endorsed on the test
record form supplied.
Daily:
Visual inspection of the battery charge LED.
Each Month:
The product will be energised from its battery for
adequate time to ensure that emergency mode is
functioning correctly.
Once Each Year:
The product will be placed into emergency mode
and check that the duration provided meets the
specied time period.
There is a control button within the bulkhead:
NOTE: This can only be completed under mains
conditions and accordingly must only be conducted
by a qualied electrician.
System reset function - Press and hold the test
button for 15 seconds. The buzzer will sound
indicating that the system timing has been reset.
Press and hold the test button and release after the
buzzer sounds once. The emergency LEDs will be
on, none of the indicators will be on. Press the test
button again to return to normal operation.
PERFORMANCE AND FAULT INDICATORS:
Normal operation Constant green LED
Monthly duration test
underway
Green indicator ashing every second
Annual duration test
underway
Green indicator ashing twice per second
Battery circuit failure
Red indicator ashing every second – buzzer will
sound twice then twice per minute thereafter
Battery over-discharge
Red indicator remains on – buzzer will sound twice
per minute
Light source failure
Red indicator ashing twice per second – buzzer
will sound twice per minute
LED indicator o in emergency mode (mains failure)
For full testing schedule, please visit:
www.eterna-lighting.co.uk/testing-schedule/