Table of Contents Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 Using this Manual . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1 Product Variants. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2 Help from ETC Technical Services . . . . . . . . . . . . . . . . . . . . . . . . . .4 Prepare for Installation . . . . . . . . . . . . . . . . . . . . . . 5 Installation Environment. . . . . . . . . . . . . . . . . . . .
Introduction Congratulations on your purchase of the ETC® SmartPack™ Wall Mount dimming pack. SmartPack continues ETC's tradition of providing the highest quality products for the entertainment and architectural lighting market. Using thi s Manual Use this manual during the installation of the SmartPack Wall Mount unit. This manual includes instructions for installing SmartPack units to operate together on a SmartLink™ control network.
Product Variants The instructions in this manual apply to the CE SmartPack Wall Mount dimming packs Part Number 7021A1103 7021A1103-LPS 7021A1105 7021A1105-LPS 7021A1106 7021A1106-LPS 7021A1107 7021A1107-LPS 7021A1110 7021A1110-LPS 7021A1111 7021A1112 7021A1113 7021A1114 7021A1115 7021A1116 2 Channel Count/ Breaker Type Operating Voltage Installed Weight (loaded) Notes 12 channel / 10A breakers 22Kg / 48lbs 12 channel / 10A (ND) 2 pole breakers 6 channel / 15A breakers 6 channel / 15A (ND) 2 pole br
3, 6, or 12 dimmer channels available Cover removed for clarity Variable speed cooling fan Capable of dimming multiple load types CE Compliant 32 built-in presets and a sequencer for stand-alone operation. I/O compartment DMX512 In / DMX512 Thru Emergency contact input SmartLink™ enabled Optional LinkPower supply for wall station support.
Help from ETC Technical Services If you are having difficulties, your most convenient resources are the references given in this manual. To search more widely, try the ETC web site at www.etcconnect.com. If none of these resources is sufficient, contact ETC Technical Services directly at one of the offices identified below. Emergency service is available from all ETC offices outside of normal business hours.
Prepare for Installation Installation Environment • Dry room (30-95% humidity, non-condensing) • 0-35°C (32-95°F) ambient temperature • Dust free • Wall-mounting location must support 23kg (50lbs) • Minimum 25.
Compliance CE Compliance • EN55015, EN55022B, EN61000-6-2, EN60439-1 • Complies with CE Directives 336/83/EEC and 73/23/EEC Verify the Contents of the Shipping Carton • SmartPack unit with cover attached. • Warning labels. If necessary replace the warning label on your SmartPack unit with the label displaying the operational language of the installed location. • SmartPack User Manual and Mounting Template. • DMX Cable Preparation Kit with 8-pin connector (4100A1012).
Cable Routing and Conduit Access CAUTION: In order to maintain safety, proper air flow and cooling, do not leave any panels removed unless facing an adjoined pack. Removable plates on either side. Remove appropriate plate to punch conduit access as needed for AC Input and load wiring. Remove plate permanently if SmartPack is mounted to the side of another SmartPack. Removable plates on top and bottom. Remove appropriate plate to punch conduit access as needed for AC Input and load wiring.
Installation Procedure Install Mounting Hardware Step 1: Affix the mounting template, if included in the shipping carton, to the wall to guide the placement of the mounting bolts or screws. If the mounting template is not provided, use the measurements below. 127mm (5.0”) 305mm (12.0”) Step 2: Note: • SmartPack Wall Mount units may be mounted up to two high by any width. Allow clearances as described on page 5 • Overall dimensions of the enclosure: 435mm x 157mm x 666mm (17.2” x 6.2” x 26.
Rough-In Conduit and Cable SmartPack Wall Mount dimmer packs have removable plates located on top, bottom and both sides to accommodate conduit fittings for supply and load wiring. Additional wiring space is provided at the top of the unit for contractor wiring convenience. Two knockouts are provided, one on each lower side, specifically for low voltage (control) wiring. See “Cable Routing and Conduit Access” on page 7.
Connect Wiring Power Supply Connections Three-Phase Supply Connections Note: If a DIN rail option kit is fitted with RCD and/or terminals, please follow the wiring instructions supplied with the kit. Input Wiring L1 N2 L2 N N2 L3 L1 N1 EARTH L2 LOAD1 Important Note: Supply cable gauge must be coordinated with upstream protective switchgear. L3 N1 Earth LOAD1 Supply cable: Lugs will accommodate 25mm2 / 3AWG maximum stranded cable.
Load Connections Earth/Ground Connections Connect the earth/ground conductor for each load to the Earth/Ground Bus. N N 12 N 12 L3 N 11 L3 10 L3 11 N N 10 N 9 L3 9N N 8 L2 8N 7 N2 N 7N 6 L2 N 6N 5 L2 N 5N 4 L1 4N 3 L1 N 3N 2 L1 N 2N 1 L1 N N 1N Incoming Load Wiring Earth/Ground Bus Neutral Connections Step 1: Prepare load conductors by stripping 6mm of insulation from the end. Step 2: Insert the stripped end into the terminal and tighten the screw using a 4.
Connect Control Wiring I/O panel to chassis ground Link Power supply (optional) Data to CPU Emergency /SmartLink DMX In DMX Thru ESD Ground Emergency, SmartLink, DMX In and DMX Pass-Thru are connected in the I/O compartment of the SmartPack Wall Mount unit. Each connection uses a pluggable screw terminal which can be removed for easy wiring. The RJ45 connection labeled J2 on the I/O board connects the I/O control board to the control CPU board for data communication to the SmartPack.
Emergency COM NET A NET B NET A NET B The six position pluggable screw terminal labeled J3 Panic/LON is provided as the termination point for both Emergency and SmartLink control. DMX NC LON2 J2 Control LON1 1 2 3 4 5 6 PAN COM NETA NETA NETB NETB 1 2 3 4 Connect Emergency Step 1: Strip 6.35mm (1/4”) of insulation from the ends of the two 1.5mm2 wires. Step 2: Remove the 6 position pluggable connector from J3 on the I/O PCB. Step 3: Twist the two 1.
Connect ESD Ground For installations with SmartLink data runs (Belden 8471) installed in grounded metal conduit there is no need to run or terminate an additional ESD drain wire. For installations not installed in grounded metal conduit follow the instructions below for ESD termination. Step 1: Locate the grounding lug on the tray of the I/O panel, just to the right of the I/O termination board. Step 2: Loosen, but do not remove, the set screw on the grounding lug. Step 3: Strip 6.
Data Termination DMX Switch UP= termination ON NC LON J2 Control LON The I/O board includes termination switches for both SmartLink data runs and DMX512. Follow termination guidelines as indicated in the graphic below. Switch DOWN = termination OFF NETB NETA 1 2 3 4 Guidelines for Data Termination: For SmartLink (silk-screened as LON) data termination: • For a single pack installation set switch 1 and 2 to the UP position.
Final Installation and Power Up Verify Installation • Is the SmartPack unit securely mounted with all mounting bolts tight? • Is there sufficient clearance 254mm (10”) in front of the unit? • Check wiring: • • Are all power supply and load cables landed and properly terminated? • Are all emergency lighting circuits separated from normal circuits with a voltage barrier? • Are all unused cable access openings covered with plugs or removable plates? • Do all control cables meet specifications? •
Set a level for a dimmer: Step 1: Press Step 2: Use < or to enter the Test menu. to scroll the selection of dimmers, choose one or [ALL] dimmers. Test Dimmer: [ All ] T Level: 100% Step 3: Use + or - to set a level, press Step 4: Press . The menu will progress to the next dimmer. . “Exit Test Mode” displays. • Exit Test Mode and retain all Test levels, scroll to [Keep Test On] and press .
18 SmartPack Wall Mount Installation Manual
Appendix A LinkPower Supply Kit One SmartLink LinkPower Supply (S-LPS) powers up to four wall stations over the SmartLink™ network. Note: You may have only one station power source on the SmartLink network. This source may be either the LinkPower Supply (S-LPS) or a SmartLink Station Power Module (S-SPM) which powers up to 16 SmartLink stations. As well, you may have up to four SmartLink host products in a SmartLink system.