Manual

Cobalt 7.1 - 20140612
52
Installation guidelines
Equipment required to run this system
Cobalt20, Cobalt10, Cobalt Nomad, Net3 RVI, Client software
Power cables
Up to three external DVI multi touch monitors.
DMX512 or Ethernet cable(s) to external equipment
Connect the monitor signal cable(s) from the back of the console to the monitor(s), and then connect
the power cables to a 230/110V outlet and start all units. After approximately 30 seconds Cobalt
should be running.
See Power-up Procedure
.