Service manual

Getting Started
1–8 V Series Service Manual
V Series
Controller
The controller complies with the following:
FCC CFR 47 Part 15, Subpart C for Intentional Radiators
CES–003 Canadian EMI Requirements
IEC 61000–4–2 (1995) ESD Immunity
IEC 61000–4–3 (1995) RD Immunity
IEC 61000–4–4 (1995) EFT Immunity
International Safe Transit Association–Procedure 1A
Humidity Test RTCA/DO–160C–Extended Humidity.
DOCUMENTATION PACKAGE
The following documentation is available to help you with the
installation, start-up, and maintenance of the V Series System. To order a
document, contact your BEST representative.
The installation instructions for the locks and controller also can be
ordered separately:
The templates required for lock installations also can be ordered
separately:
Document Title Doc. No.
8KV/9KV Installation Instructions T61918
30HV Installation Instructions T61919
XV Controller Installation Instructions T61920
Document Title Doc. No.
Installation Template for 83KV/93KV Locksets T61921
Installation Template for 34HV–35HV Locksets T61922
Installation Specifications for 34HV–35HV
Locks/Hole Pattern Chart for 34HV–35HV Locks
T61923
V Series Controller Drilling Template T61924