User guide

Installation of the WeR@Home™ System
178
WeR@Home
System User Guide
3.14.3 Installing the Z-Wave
®
Controller
Notes: The following procedure of installing the WeR@Home
Z-Wave
®
Controller is
based on the assumption that the Z-Wave
®
Controller is being added onto a fully
operational WeR@Home
system.
Due to the installation procedure, a Power Failure event will be logged and a
notification should be expected.
1. Disconnect the Central Control
Unit (CCU) from power by
plugging-out the power adaptor
cube from the electric power
(mains) socket.
2. Disconnect the power cord from
the CCU:
Note: The mini-USB
socket is for the WeR@Home
power cord only. Do not connect
other USB
equipment to this socket.