User Guide Part 2

Installation of the We.R™ System
36
Notes: The LED switching from orange to green indicates that the CCU is
properly active. It takes approximately 5 minutes for the LED to switch.
The Central Control Unit is now ready for the next step of registration and setup.
Note: The initial registration is a web-only procedure and therefore could be
exercised utilizing the Web Application only (cannot be done with the
Mobile Application).
3.2.3. Activating the Central Control Unit
Notes: This paragraph details the initial registration process of the system,
utilizing the We.R
Web Application software. It is a one-time procedure
exercised as part of the activation of the system’s Central Control Unit. The
We.R
Web Application is a comprehensive software package dealing not
only with this initial registration procedure but with all aspects of
administrating the We.R
system (Status reports, peripheral devices’
add/remove and setup, events history, etc.). It is, therefore, recommended
to read paragraph 3.3 The We.R Web Application below prior to the
activation of the CCU.
Activation of the CCU begins with registration of the We.R
system with the Service Provider’s
web server. Besides introducing the We.R
system to the server, via the cloud, it also allows
the definition of method of mobile communications.
Note: Typing-in the login information (email address and password) and
clicking over the button will be the only action required for
subsequent logging onto the We.R
Web Application.