Instruction Manual

WARNING
This product must be disconnected from the circuit if subjected to any high
voltage or insulation resistance testing. Irreparable damage will occur if this
instruction is not followed
Recommended routine test procedure in accordance with BS 5266
Daily check - check that the status GREEN LED indicator is illuminated
Monthly functional test - simulate a mains supply failure for approx. 30 secs by
operation of a key switch or circuit breaker. Ensure normal supply
is restored after test and the indicator status LED is illuminated.
Twice yearly conduct a one hour duration test - simulate a mains supply failure
breaker. Ensure normal supply is restored after test and the indicator status LED
is illuminated
Annual full three hour duration test - conduct a three hour continuous
duration test. Simulate a mains supply failure for three hour continuous test by
r. Ensure normal supply is
restored after test and the indicator status LED is illuminated
GENERAL
the correct manner when it reaches the end of its life. Check local authorities for
where facilities exist. Clean with a soft dry cloth only , do not use aggressive cleaning
GENERAL INSTRUCTIONS
These instructions should be read carefully and retained after installation by the end
user for future reference and maintenance.
SAFETY
or competent person to the current IEE Wiring Regulations
Please isolate mains prior to installation/maintenance
not exceed the rating of the circuit cable, fuse or circuit breaker
Please note the IP (Ingress of Protection) rating of this luminaire when deciding
the location for installation
electrician. See overleaf for test record sheet
INSTALLATION
Provide power to the required point of installation. Suitable IP rated junctions
boxes should be used where required
with any joists, gas or water pipes or electrical cables
For non-maintained operation please wire up connector block as shown in Fig 3
For maintained operation (luminaire always on) please see Fig 4
For switchable maintained operation
see Fig 5
Connect the battery via the plug and
socket on the PCB
Switch on the power supply and ensure
the LED indicator is illuminated Green
• Remove two screws
• Pull apart tabs (see Fig 2) to
gain access to the connections
Fig 1 Fig 2
Fig 3
Fig 4
Fig 5
Insert link
cable
Remove screws Pull apart tabs
• Switch on the power supply and ensure the LED status indicator is illuminated
green to ensure the battery and supply are functioning.
After 36 hours on continuous charge a mains failure should be simulated to ensure
successful operation.