22.0 Annual Service Check:
The ST900 Fireplace should be serviced annually to ensure it continues to operate in a safe
manner. This annual service check should involve the following
Clean & test thermocouple
Check glass assembly gasket
Clean pilot and main burner jets
Paint firebox [if required]
Inspect flue system [if possible]
General clean and inspection
23.0 Installation Check List:
1 Fuel bed correctly installed as per manual
2 Operating pressure checked with fireplace running on full (high flame setting)
and all other gas appliances in the house switched on.
3 Flue restrictor fitted if required, Flame picture verified 15 minutes
After start-up.
4 Ensure the pilot frame is clearly visible and free from loose
material (coals).
5 After dry wall installation and finishing, run fireplace on high for 60 minutes
with house doors and windows open to clear smell of paint and oils
initial burn.
6 Fireplace and flue clearances comply with these instructions.
7 Fireplace securely fixed to wall.
8 Leak test all joints and pressure test points. Soapy water and drop test
done on pipe work.
9 Remote cradle screwed to wall.
10 House holder has been shown how to operate fireplace.
11 User manual + instructions have been left out for house holder, installer has
filled in their own details and fireplace serial number into warranty card.
12 Inform the customer that the fireplace may continue smelling for a while after
installation depending on frequency & duration of use
13 Given House Holder Plumbing Industry Commission Compliance
Certificate.