Installation manual

630167_5_Manual_Installation_US_R-emotion
19.0 Commissioning the Fire:
After the cladding and finishing processes are completed, the gasfitter must return to the
site to fit the grill trim, run the fire for a minimum of 20 minutes and finally assemble and fit
the fascia.
19.1 Assembling the Ferro fascia:
1. The ST900 Ferro fascia has two brackets supplied in the fascia box which have not been
fully assembled. To assemble them use the 4x screws supplied to fasten the brackets to the
fascia as shown below. Position the brackets with the flange facing outwards, and the
hooks facing the bottom of the fascia [Identify the bottom of the fascia by the large cut-out
shown below].
2. Fitting the Grill Trim:
Packed in with the fascia kit is the Grill Trim.
Attach this to the fire using the 3 supplied
screws in the positions shown to the right.
The perforated surface (grill) should be on top.
→ If you are installing the ST900 with a FERRO fascia: SEE SECTION 19.1
→ If you are installing the ST900 with a VELO fascia: SEE SECTION 19.2