Installation manual

630167_5_Manual_Installation_US_R-emotion
Now, put the gas data (Propane sticker shown)
sticker supplied in the conversion kit in onto the
dataplate of the ST900 in the position shown.
Note: This will need to be completed on the
English language as well as the French
language dataplates. (English language
dataplate shown)
The sticker must be signed and dated by the
tradesperson who has completed the gas type
conversion.
The conversion is only complete once the
conversion label has been adhered to the
available label plate and filled out by the
tradesperson who has completed the gas
type conversion.
ST900
US Edition
R
C US
Sticker