Installation manual
630288_0_Manual Service ST900 NZ R-emotion
12.0 Re-assemble
Once the service work is complete, the fire should be re-assembled by reversing the
actions done in previous steps, replacing the Pilot Cover, Burner, Fuel bed media,
Glass assembly, and Control Tray (if removed).
13.0 Re-establish Power and Gas Connections
With all applicable service work completed and the fire fully assembled again the gas
can be re-established and the batteries replaced.
Check gas inlet pressure against data plate at pressure test point using a manometer.
Adjust gas pressure to specifications.
Remove the manometer and replace the test point screw.
Leak test all test points and gas system joins/unions.
Check that the pilot flame correctly impinges on the flame failure device
(thermocouples should not glow red, as this indicates that the pilot flame is set too
high and will reduce the life of the thermocouple).
14.0 Re-fit the Fascia
The fascia uses these four hooks for attaching to the fire. Do this by lining up the
fascia hooks with the receptacles on the sides of the fire. Lift the facia so that the
hooks are above the receptacles, and let it drop down into position until it is secure
and free from movement.










