Installation manual
630288_0_Manual_Installation-Service_ST900_AUS NZ
37
21.0 Annual Service Check:
The ST900 Fireplace should be serviced annually to ensure it continues to operate in a safe
manner. This annual service check should involve the following
x Replace thermocouple
x Check glass assembly gasket
x Clean pilot and main burner jets
x Paint firebox [if required]
x Inspect flue system [if possible]
x General clean and inspection
22.0 Installation Check List:
1 Fuel Bed Media correctly installed as per manual
2 Operating pressure checked with fire running on full (high flame setting)
and all other gas appliances in the house switched on.
3 Flue restrictor fitted if required, flame picture verified 15 minutes
after start-up.
4 Ensure the pilot frame is clearly visible and free from loose
material (coals).
5 After plasterboard installation, fire run on high for 60 minutes with house doors
and windows open to clear smell of paint and oils initial burn.
6 Fire and flue clearances comply with these instructions.
7 Fire securely fixed to wall.
8 Leak test all joints and pressure test points. Soapy water and drop test
done on pipe work.
9 Remote cradle screwed to wall.
10 House holder has been shown how to operate fire.
11 User manual has been left out for house holder, installer has filled in their
own details and fire serial number into warranty card.
12 Inform the customer that the fire may continue smelling for a while after
installation depending on frequency & duration of use
13 Given house holder Plumbing Industry Commission Compliance
Certificate.










