B3 Flue Conguration (For less than 4m length)
If your ue system is less than 4m long (as shown in the diagrams below), then a simple
exible ue is required. if you wish to install a longer ue run, up to 12m, see section B4.
4m MAX
X
Y
X + Y = 4m MAX
= 0.6m MIN
1.2m Co-axial Flue
Note: You must provide sucient access to the
powerue to enable it to be serviced in the future.
This means that the fan unit must have sucient
access to allow it to be replaced if necessary.
The ue must be securely xed and adequately supported by brackets fastened to the
building structure at suitable points to ensure the stability of the ue system.
Any joints within the ue system must be sealed adequately, with a sealing agent used
if necessary. The ue system for the DX1500 / DX1000 is zero rated, so no spaces are
required between the ue and any timber framing.
Horizontal Flue option
Minimum: 600mm ue length
Maximum: Total ue length 4m
Vertical Flue option
Minimum: 600mm ue length
Maximum: Total ue length 5.2m
For ue installation, see section D
ONLY USE ESCEA APPROVED FLUE COMPONENTS
Note: All sections of horizontal ue if exible must be sloped back toward the re at
a rate of no less than 20mm per metre, to allow any condensation to run back into
the appliance.
X
Y
X + Y Maximum = 4m
Y Maximum = 1.5m
Y Minimum = 0m
X Maximum = 4m
X Minimum = 0m
X + Y Minimum = 0.6m