Service manual
B
ACDEF
GSERVICE
39
G
Installation Checklist
Go through the following checklist to ensure you have installed the appliance correctly
Correctly sized cavity to suit your fascia and ue conguration
Correct clearances to combustibles and mantles around the fascia
An electrical isolating switch to the appliance, accessible after nished installation
Correctly sized gas supply with a pressure test point, ensuring adequate supply with
all other gas appliances in the dwelling running
A weather-tight installed Horizontal or Vertical Powerue Terminal with clearance as
specied by AS/NZ5601.1
If chosen, reasonable access to the outside face of the Horizontal Powerue Wall Ter-
minal for maintenance purposes and ue attached to the rear of the Horizontal Powerue
Wall Terminal leading back to the appliance (and similar for Vertical Powerue Terminals)
The electrical cable from the Powerue Terminal attached correctly and run back to
the appliance cavity in an electrically safe manner
The appliance xed to the cavity base
The appliance plugged into a mains electricity supply
All gas joints and pressure points leak tested, and suitable leak detection solution and
drop tests completed on gas pipework
Fuel bed correctly installed
Glass correctly tted
Operated the re and veried that it lights reliably and safely
Appliance functions checked, including thermostat operation, Flame Eect and Fan
Boost
Data label marked up with correct gas type, and dated by installer if converted during
installation