D2 Installing the Vertical Powerue Roof Terminal option
The vertical ue option is designed to have the box containing
the fan and electricals mounted within the roof space of the
house, and the vertical 200mm diameter twin wall ue pen-
etrate through the roof. The standard kit comes with 1.2m of
twin wall ue (post fan). Note total combined maximum vertical
ue before the fan must be less than 12metres (max 4m Flexi+
max 8m polypro).
Use standard methods to ash the roof penetration, the instal-
lation must be weather proof and conform to all local council
standards including powered ue roof termination rules.
The cowl surround should be xed in place as shown
Mount the fan assembly box to roof framing using timber or
builders strapping, ensuring the ue is vertical and rigidly
mounted.
Aim to have the fan box mounted as high as possible, mainly to
allow sucient fall for condensation drainage if the exi-ue is
to run horizontally.
Ensure there is sucient space below fan box to have access to
t the exi-ue tubes and to allow owing bends if required.