D2 Installing the Vertical Powerue Roof Terminal option
The vertical ue option is designed to have the box containing
the fan and electricals mounted within the roof space of the
house, and the vertical 200mm diameter twin wall ue pen-
etrate through the roof. The standard kit comes with 1.2m of
twin wall ue (post fan). Note total combined maximum vertical
ue before the fan must be less than 12metres (max 4m Flexi+
max 8m polypro).
Use standard methods to ash the roof penetration, the instal-
lation must be weather proof and conform to all local council
standards including powered ue roof termination rules.
The cowl surround should be xed in place as shown
Mount the fan assembly box to roof framing using timber or
builders strapping, ensuring the ue is vertical and rigidly
mounted.
Aim to have the fan box mounted as high as possible, mainly to
allow sucient fall for condensation drainage if the exi-ue is
to run horizontally.
Ensure there is sucient space below fan box to have access to
t the exi-ue tubes and to allow owing bends if required.